Showing posts with label st brigid. Show all posts
Showing posts with label st brigid. Show all posts

Wednesday, April 2, 2008

The sweater of Sisyphus

Having completed St. Brigid, I am now embarking on a couple of new projects. Or trying to, anyway. Full of enthusiasm and hubris from the completion of an involved Aran sweater, I jumped headlong into this:


This is a child's pullover designed by Dale of Norway and published in the Spring 1997 issue of Interweave Knits, which is of course sold out, so I purchased it for too much money on eBay because Claire loved it. As a sort of compensation, I decided to knit the sweater in Patons Astra rather than in a Dale yarn or a similarly expensive natural fiber. After all, Claire is going to get it absolutely filthy and I'll want to machine wash it, right??


So off I go. I made a lovely swatch in the round using all the colours Claire requested (she is into blue these days):


dalepullswatch.jpg


Well, the first three times I started it, I twisted the join. Yes, I laid it down and checked to see if it was twisted before I joined it. But, uh, not on the floor.


So I restarted a fourth time. I laid it down on the floor and joined it properly, and it was 100% untwisted. Well, I got home from adjudicating a recital on Saturday night, and opened my bag to knit, and ... it was gone. Gone, I tell you! After I bought an indestructible Tom Bihn bag in ballistic nylon with the world's biggest snap buckle so nothing would ever fall out. So yes, it's gone ... along with the 2.5mm Inox Express circular I was using for it.


GAHH!! So I gave up for a few days and started a simple self-patterning sock for B. in shades of grey:


meilenweitsock.jpg


Then today I finally managed to start again. It is joined correctly, and it is never leaving the house except if Claire is wearing it!!


After the moth-eaten saga of St. Brigid, sometimes I wonder if the universe is telling me not to knit. Well, pthhhhh Universe, I'm not listening!


Saturday, March 22, 2008

Happy Easter! St Brigid is finished!!

I can hardly believe it, but it's finally done. Forthwith, the photolog:


Pieces being blocked in front of the fireplace:


blocking1


blocking2


blocking3



My row gauge, as usual, was off, but I was planning for this in a way, and so my St B has a somewhat closer-fitting, less boxy shape than the original design. I'm happy!


The finished product:


stbrigid_finished


On me (note ever-present cat at lower right):



I left off the turtleneck ribbing ... just as well, as even after ordering 8 more skeins of Hebridean 3-Ply from Virtual Yarns, I was still running a bit short. I think the wider neckline is more flattering on me anyway.


I find a certain wonderful symmetry in the fact that on the day I finally reached this goal, another person I admire reached a long-awaited goal as well. Kudos and congratulations to our finest figure-skating artist, Jeff Buttle, on winning his first world championship!


Another goal I reached this month: I premiered a piano concerto. I'm not sure why I haven't been writing about it here, but I guess I've just been spending all my time practising it. I'm wondering if I should start a separate blog for music stuff ... any thoughts?


Anyway, next on the agenda: a Nordic sweater for the lovely young lady in the top picture, from the spring 1997 issue of Interweave Knits. Here's hoping it doesn't take me 3 years to finish this time!!

Thursday, February 14, 2008

Low-rank nerd


I am nerdier than 68% of all people. Are you a nerd? Click here to find out!


That seems about right. I'm about as nerdy as ACB apparently, but not nearly so much as sogalitno. No doubt if there were a classical music nerd quiz I'd be off the charts ...

St Brigid: I ordered some more Hebridean 3-ply to make it full-length, especially since my row gauge is always off. No doubt there will be a visible dye lot mismatch after all this time ... but I'll try to use the new stuff mostly on the back at this point. Hope it comes soon (and then I can test out my swift and ball winder, increasing my knitting geek score!)

Meanwhile Johanne is doing fantastically well with hers. Way to go!

Saturday, February 2, 2008

Happy new year. Oh wait ...

Good grief, is this my first post of 2008? Gah. I really need to get better about this.

In any event, the Monkey socks are done!! They feel great on the feet too.

monkeysocksdone.jpg

Next sock priority: to darn the Eleanor socks, which already have a hole in them (Darn!)

Also I am 3/4 (at least) of the way to completing the back of St Brigid. It's getting kind of routine now but the yarn and cables are so lovely that it's still a pleasure to knit.

And, in sewing news, I completed a Dora-themed nightgown for Claire (Kwik Sew 3105). My gathering and ruffling skills are improving a bit. It's still not perfect, but I'm OK with it. She's been wearing it to bed, so at least the major goal is accomplished.

claire_dora_nightgown.JPG

Next sewing project: a T-shirt from Wazoodle's Grab Bag for girls, using the ever popular Jalie 2005 t-shirt pattern.

In other news, I am fiercely attempting to memorize the concerto I'm premiering next month. Fun times.

All right, here's hoping I don't skip another month!!

Random photo goodness #1: A platypus on my cat (sorry, stuffonmycat.com):

googles_on_my_cat.jpg

Random photo goodness #2: Matching father-daughter chinrests:

father&daughterchinrests.jpg

Friday, August 17, 2007

Slow and steady

Since we got back from Newfoundland on August 7, things have been pretty crazy. I didn't expect to be playing or coaching nearly as much as I have. So things have progressed slowly on the crafty front. On the Rock I finished the back of DH's pullover:

rugbybackLink

Rows and rows of stockinette, but the Naturally Tussock DK from New Zealand is lovely, flecked with all kinds of tweedy bits. I also finished my first ever Jaywalker, in Socks that Rock Lightweight. The colourway is Fairgrounds, which is nice and summery:

STR_jaywalker1

My first completed sewing project in August is the bag from KwikSew 2320. It was fun, but I probably should have bought some heavier machine needles for sewing through four or more layers of fairly sturdy cotton. My thread kept breaking, which usually doesn't happen with Gütermann thread. Anyway, I learned to install grommets and reviewed a bunch of other construction things, which was nice.

kwiksew_pinkbagLink

Now on with the second sock, and the front of the pullover. I'll get back to St Brigid when that's done. Sewing projects in the queue: a buttoned pillow cover for our new chair in the living room; matching aprons for me and DD; some pajama pants with contrasting cuffs (this and the pillow are from Sew Simple 1) and a tunic from some African printed cotton I bought from Wazoodle a while back.

Very sad news this week of Richard Bradshaw's passing. The Collaborative Piano Blog has a collection of links to obituaries and memoirs. I still have not visited the new Four Seasons house in Toronto... early childhood and opera houses don't mix too well ... but I do appreciate all Maestro Bradshaw did for our Canadian opera scene. He will be missed.

Friday, June 22, 2007

Sick again

Hi folks - remember the nasty sinus infection I had a while back? well, it's back ... explaining why I haven't had much to blog about lately. I am still working on detangling the washed, unraveled St Brigid yarn, and the Eleanor socks should be done soon. I've been sewing a bit too, making placemats, pillowcases, and other simple things. (Even a zippered case!)

Anyway, I'm waiting to find out whether I need more antibiotics, and hope to be on the mend soon so I can share more pics and progress with you!

Friday, June 8, 2007

Knitting update

2 repeats done on the back of St. Brigid:















At this rate, I should have the thing done by the time I'm, oh, FIFTY. And this is with only two projects on the needles, people. It's the damned internet. I need to focus ...

I did manage to finish the first Eleanor sock, finally.















I do like how the lacy pattern shows up in the Fleece Artist. Interesting without being over-busy. The second sock is on the needles now ... no 2nd sock syndrome for me.

Another cool thing that happened this week was that I became one of the lucky beta-testers for Ravelry. I am in the illustrious company of Marina and Theresa, among other fabulous knitters and knitbloggers. It's very cool to be able to compare your projects directly with those of others, and to see multiple versions of a project you're contemplating. Major kudos to Jess (frecklegirl) and Casey for this great endeavour.

I've been getting back into sewing on a very small scale, pursuing some of the little projects in the first issue of Sew Simple. My finishing techniques are, predictably, somewhat spotty, but improving. And they don't seem to mar the finished products too much. Next up: a purple pillowcase for my purple-obsessed little princess, some placemats, and some hand-embroidered (!) kitchen towels.

The preshrinking part would be a lot easier, of course, if my dryer was actually pumping heat instead of just air ... but I guess I'm being unconsciously enviro-conscious then, aren't I!

Wednesday, May 9, 2007

Craziness abates

Sigh ... only to pick up again this weekend as DH heads out of town for a conference. Well, it will be nice to spend some girl time with DD, and I did get some lovely things in the mail this week to amuse me:







A copy of A. *more's Tudor Roses from a lovely British eBay seller. Ah, I love this book already. I see myself making most of the things in here, but first off would be Henry VII for DH and Catherine Parr for me.

And:






Some really lovely stitch markers from Purl Blossom's Etsy store. Now I finally think I have enough to dispense with the old plastic ring markers altogether! What a nice reward for finishing a section ... to be able to slip one of these to the right needle. Little things excite me, I guess! Anyway, I highly recommend Purl Blossom's store for beautiful stitch markers, promptly shipped, and she plans to add other items soon.



Not much knitting progress to report. This week was nuts. I worked pretty much every day, including Sunday, and DD was sent home from daycare with pinkeye on Thursday so no knitting time on Friday.

Nonetheless, Sleeve #2 of St Brigid is coming along but since you've already seen sleeve #1 I didn't think another pic was necessary. I also managed to turn the heel and make the gusset on Eleanor Sock #1. It was cool doing this on two circs for the first time:
















As I've reported on runagogo, I'm getting to the end of Week 5 of C25K. W5D3 is the fearsome day where you finally run 2 miles non-stop. Going from 3 to 8 consecutive track laps seems like a lot ... but I guess I just have to think about the half marathon and how this is less than one-sixth of it. Doesn't feel like it, I'll tell you!! The good news will be that everything after that feels easier.

I also finished reading Ratking, which I enjoyed very much, and I'll be looking forward to further installments in the Zen series. How sad that Michael Dibdin is no longer with us.

Friday, April 27, 2007

The calm after the storm

This past week has been insane. Hence, the lack of posts. But I have made some progress:















On the left, a nearly-completed Sleeve #1 of St Brigid which will have a full extra pattern repeat in it. On the right, the Eleanor sock in Fleece Artist.

Also some stash enhancement:















From left to right: Socks that Rock Lightweight in Fairgrounds; Naturally Tussock DK, for a polo-neck pullover for DH; various colourways of Meilenweit Meeting, from the lovely Robyn of Red Bird Knits.

In other news ... planning for DD's birthday proceeds apace. I've stencilled a treasure box for her party ... costumes and the like will fill it ... but I don't want to post a pic yet for fear she'll spot it. So that will have to wait until after the party next weekend. I have a choir gig on Sunday and possibly some more accompanying work in May, but otherwise things are calming down. I've completed Week 3 of C25K as of today, w00t! I hope to be back to half-marathon form by the fall.

Wednesday, April 11, 2007

Wednesday miscellany

Knitting report:

St Brigid progress continues. 2 1/2 pattern repeats done on the sleeve. I hope I am doing the increases right. As I fold the sleeve around my arm I wonder if it will be too tight, but I'll keep going for a while.


















Meilenweit Sock #2: I've finished the gusset decreases and I'm knitting on the foot now.

Health report:
I'm on a bit of a kick. I am on Wave 1, Day 2 of the Sonoma Diet which I've been on and off for about 4 months now. I love the Mediterranean food and don't feel deprived at all. Also, I signed up at Runagogo and restarted the Couch to 5K running programme. I feel great already!! I hope I can keep this up.

Piano report:
Ugh. Trying to get inspired to practice. I guess it's been a heavy semester and right at the moment I'd rather be knitting, running, and playing on the computer. Nonetheless, I have a concert with a local chamber choir on the weekend and a bunch of performance juries coming up, so I need to get busy.

Blog report:
Jeremy Denk made me laugh out loud yesterday.

Fridge report:
Wendy challenged us to reveal the innards of our refrigerators! OK, I'll take you up on that:


























I remember when my fridge was nearly bare (grad school) but now that I'm eating veggies and have a daughter, things are a bit different ... At least there aren't as many science experiments in there as there once were!

Friday, April 6, 2007

Sleeve #1 in progress

Some progress to report on St Brigid:
















After swatching on 3.75mm circs, I found that the end result was a bit too wide, so I frogged and swatched again on 3.5mms. This gauge was near-perfect. So I forged ahead, this time deciding (like many on the St Brigid KAL) to begin with a sleeve as a secondary gauge check. This morning I noticed that I'd made a stupid mistake in the Chart B cable, so I restarted -- making today the official start date. I managed to finish a full pattern repeat this morning!

Wednesday, April 4, 2007

St Brigid underway again

I have finally ripped out all of the moth-eaten St Brigid pieces, and started re-swatching with 3.75mm bamboo circulars (Kertzer) with a ball I hadn't used up yet. Tomorrow I'll wash the used yarn and hang it to dry.

I'm getting about a half-stitch wider than the recommended gauge, but I think that will just accommodate my piano butt ;) My row gauge is, as usual, short, but so am I, so that works out OK.

Today I played a song by John Corigliano for the first time: "Christmas at the Cloisters". It's really an excellent piece and I hope I'll have the chance to do more.

Thursday, March 29, 2007

Status quo


I have a near-FO - ChildHood from Knitty Summer 03 for my nearly 4-year-old daughter. I just need to get some sew-in snaps. (Can you believe that one of the local Fabricland stores didn't have them?!) This is done in Mission Falls 1824 Wool.






My current WIP is this sock in Meilenweit Cotton Fantasy. I am using the free jacquard stripe sock pattern I got from the Patons web site (though I can't find it there anymore). It's a very simple top-down pattern with a slip-stitch heel. I plan on expanding my sock construction horizons sometime soon, but this pattern is so perfect for the self-striping yarns.




Next project: an oldie that's new again -- St. Brigid from A. *tarmore's Aran Knitting (see this recounting by The Girl from Auntie for info on why I'm not using her full name). I ordered the yarn from Virtual Yarns when Claire was a baby, and the designer's daughter recommended the colour Red Deer for me on the basis of a photo of us. But for some reason (the craziness of new motherhood, most likely) I never completed it, and the pieces I did complete got eaten by moths!! So I am ripping out and starting fresh. Here is the mess as it stands today:








Eeeeeeek!!